I encountered a challenge during the installation of the secondary Check Point management server. The primary server installation was successful. However, after completing the first-time wizard on the secondary server, I checked the API status from the CLISH CLI. The API status test failed, even though the CPM has started and is ready. The issue is that the API is stopped.
I am currently troubleshooting the API status failure on the second management server.
Your suggestions and advice are awaited.
Server Smart-1 600M.
OS GAIA R81.20