Here's "Tims's" question 🙂 @Timothy_Hall
Trying to work out number of MQ cores for my upgrade from 41k to 26k (VSX but that's not the point)
41k processors are technically twice slower according to publicly available benchmarks (Xeon Gold 6254 CPU @ 3.10GHz vs Xeon CPU E5-2658 v2 @ 2.40GHz)
Current 41k chassis runs 36Gbps accross 4 SGMs, so 9Gbps per SGM.
Each SGM is set up with 8 HT cores for MQ and it runs at 50% CPU / 9Gbps. FWK cores average 25% atm.
Allocating 4 x 8 = 32 cores on the new 26k seems excessive, especially considering that actual CPU HW is much faster.
Having 72 HT cores in total I thought doing 24 (1/3) for MQ / SND and rest 48 for CoreXL. I need to leave room for growth of course.
Note that most traffic currently is accelerated (>85%)
Any thoughts on this? 🙂