Hi,
Currently operating a maestro setup consisting of 6500's. And are now looking into changing this to 6700's.
Does anyone know how I can go about changing the hardware for a security group with minimal down time ? .. As the mixh and match is not an option, I would assume that 'cleaning out' the 6500 appliances of the security group first - and then add the 6700's
But how will the maestro act if I add a 6700 to the excisting secgroup with the 6500's ? Is there a way that I can do this just to get the hardware changed without downtime ? Anyone know ?
I would think that with a dual chassis setup (dual site) there would be possibilites ? Changing the hardwar eon one site, failing over, then the other.. But for a single sec.group ?
Any tips ?