Create a Post
cancel
Showing results for 
Search instead for 
Did you mean: 
MiniNinja
Collaborator
Jump to solution

The indicator of the first port is on but there is no cable

We received CheckPoint 6200, installed it using isomorphic with USB R81.20, then take 76.

The indicator light is on on the first port, and without a connected cable.

The port is disabled in the Web interface.

 

0 Kudos
2 Solutions

Accepted Solutions
the_rock
Legend
Legend

I had customer who had that exact problem, they shut down the fw, powered it back on and problem went away. If that does not work, then you should contact TAC.

Way they did this...ran halt on ssh, box powered off, they waited couple mins, removed power cables, waited few mins, plugged them back in, powered on the appliance, issue solved.

Andy

View solution in original post

0 Kudos
AkosBakos
Leader Leader
Leader

Like the totally freezed LOM..... poweroff -> detach the power cord ->wait 5 minutes... 

 

----------------
\m/_(>_<)_\m/

View solution in original post

4 Replies
G_W_Albrecht
Legend Legend
Legend

Open a SR# with TAC, RMA could be needed !

CCSP - CCSE / CCTE / CTPS / CCME / CCSM Elite / SMB Specialist
0 Kudos
the_rock
Legend
Legend

I had customer who had that exact problem, they shut down the fw, powered it back on and problem went away. If that does not work, then you should contact TAC.

Way they did this...ran halt on ssh, box powered off, they waited couple mins, removed power cables, waited few mins, plugged them back in, powered on the appliance, issue solved.

Andy

0 Kudos
AkosBakos
Leader Leader
Leader

Like the totally freezed LOM..... poweroff -> detach the power cord ->wait 5 minutes... 

 

----------------
\m/_(>_<)_\m/
the_rock
Legend
Legend

Yep, had that too.

Andy

0 Kudos

Leaderboard

Epsum factorial non deposit quid pro quo hic escorol.

Upcoming Events

    CheckMates Events