Standalone Full HA deployment currently running 80.10 but soon to be upgraded to 80.30 before the gateways are deployed into Production.
Looking to find out how to configure the gateways to failover to the backup gateway if the following conditions occur:
1. WAN or LAN interface go down
2. If the WAN or LAN interface remain up but a switch or upstream/downstream device fails which effectively result in the gateway being able to access the internet or internal network; the gateway fails over to the backup
Thanks