Maestro Masters
Round Table session with Maestro experts
I am currently planning to expand our Maestro environment:
currently: 2*MHO175 + 3*9700 appliances, single site, one security group, VSX with 4 virtual systems, R81.20
this is to be extended to a second data center, the necessary hardware, i.e. another 2*MHO175 + 3* 9700 appliances is available.
How do I expand Maestro single site to dual site without or with minimal downtime? Unfortunately, I have not found any suitable instructions.
What happens to the existing security group and traffic flow if I run the standard setup for dual site like this:
on each MHO
Orch_1_1> set maestro configuration orchestrator-site-amount 2
Orch_1_2> set maestro configuration orchestrator-site-amount 2
Orch_2_1> set maestro configuration orchestrator-site-amount 2
Orch_2_1> set maestro configuration orchestrator-site-amount 2
on site 1 (currently productive)
Orch_1_1>set maestro configuration orchestrator-site-id 1
Orch_1_1#orchd restart
Orch_1_2>set maestro configuration orchestrator-site-id 1
Orch_1_2#orchd restart
on site 2
Orch_2_1>set maestro configuration orchestrator-site-id 2
Orch_2_1#orchd restart
Orch_2_2>set maestro configuration orchestrator-site-id 2
Orch_2_2#orchd restart
on side 1 - Back up the /etc/maestro
Orch_1_1#cp -v /etc/maestro.json ~/maestro.json_BKP
Orch_1_1#cp -v /etc/maestro_full.json ~/maestro_full.json_BKP
Orch_1_2#cp -v /etc/maestro.json ~/maestro.json_BKP
Orch_1_2#cp -v /etc/maestro_full.json ~/maestro_full.json_BKP
on site 2
Orch_2_1> set maestro port 1/31/1 type site_sync
Orch_2_1#orchd restart
Orch_2_2> set maestro port 2/31/1 type site_sync
Orch_2_2#orchd restart
on site 1
Orch_1_1> set maestro port 1/31/1 type site_sync
Orch_1_1#orchd restart
Orch_1_2> set maestro port 2/31/1 type site_sync
Orch_1_2#orchd restart
on site 2
Orch_2_1#orchd restart
Orch_2_2#orchd restart
on site 1
Orch_1_1>set maestro security-group apply-new-config
In which steps does the traffic flow interrupt?
Has anyone already performed a similar task?
Thanks for help
Uwe
1) prepare site 2 ORCHs in advance with all the relevant configuration (site id, amount of site etc.).
2) make all the physical connectivity between MHO's between the sites. this means stretching VLANS. check this SK:
https://support.checkpoint.com/results/sk/sk168092
also , depending on the architecture, check also this SK:
https://support.checkpoint.com/results/sk/sk181385
3) configure production MHO's for amount of site 2 and restart orchd gradually (per MHO in Production).
to avoid sync between them it's recommended to shutdown local sync port between them.
4) Test connectivity between MHO's between sites:
MHO1-1 to MHO 2-1 - ping 203.0.113.15
MHO2-1 to MHO2-2 - ping 203.0.113.16
5) restart orchd on both site 2 MHO's in order to sync with Site MHO's and get all the SG configuration.
verify under /etc/sgdb.json.
6) activate auto-clone in SG and add SGM's.
when SGM's are added make sure you have connectivity between Site1 SGMs and site2 SGMs by pinging from SGMs to 192.0.2.15, 16 etc. (at least have ARP).
Leaderboard
Epsum factorial non deposit quid pro quo hic escorol.
User | Count |
---|---|
18 | |
3 | |
2 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
About CheckMates
Learn Check Point
Advanced Learning
YOU DESERVE THE BEST SECURITY