Thank you for the information.
The cutomer's environment need special permission to stop the system,
we should to minimize the time the system is down. And we don't have the permission of changing the existing system.
So we plan to build a new Quantum and Smart-1 and operate them in parallel.
This ways, customers can switch equipments with minimal downtime.
Is there migrate ways existing equipments(FULL HA and R80.30) configuration to new equipments(Distributed R81.10 )?
Thanks in advance
Is there mirate server