Dear,
We will replace a Model 5800 Cluster with the Model 5900.
I am defining the best strategy to change the cluster without downtime.
I thought in the following order, I would like to validate if it is possible or a better suggestion.
BEFORE THE WINDOW
1- Save Configuration GW1 and GW2 of the current 5800 cluster.
2- Import the Save Configuration of GW1 and GW2 from the 5800 model into the 5900 cluster
In the maintenance window
1- Turn off the GW2 (stand-by) 5800
2- Connect the GW2 5900 instead of the 5800
3- Take the SIC
4- Install Policy
5- Switch the cluster to make the GW2 5900 Active
6- Validate communications
One of the doubts I had is whether the Cluster will be established because they are different models, and have a different number of colors.