Create a Post
cancel
Showing results for 
Search instead for 
Did you mean: 
heavysoul
Participant

'cphacu start no_dr' query - R80.20 upgrade from R77.30 (VRRP cluster)

Hi Guys I'm planning upgrade of 2x5600 gateways in VRRP cluster, as per 'Connectivity Upgrade of a VRRP Cluster' section of 'CP_Cluster_ConnectivityUpgrade_BestPractices.pdf' Currently: - VRRP master = node1 VRRP backup = node2 cphaprob state = Active/Active According to above guidelines, having upgraded node2 to R80.20 & installed Jumbo Hotfix Take #87, I need to sync the connection tables before VRRP failover, to ensure node2 is processing traffic when it becomes VRRP Master - 'cphacu start no_dr' on node2 Q - as both nodes 'cphaprob state' = Active/Active, am I right to assume the tables are already sync'd and therefore 'cphacu start no_dr' step is not required? Is it simply a case of checking the connections on node2 via 'cpview' Many thanks in advance Gary
2 Replies
Maarten_Sjouw
Champion
Champion

The way it sounds, it indeed already has synchronization running and you should be able to switch, without loosing connections.
Regards, Maarten
heavysoul
Participant

thanks Maarten

Leaderboard

Epsum factorial non deposit quid pro quo hic escorol.

Upcoming Events

    CheckMates Events