This is an example of two site deployment (fictional sites are TX and VA).
Number of assumptions were made in creating this document regarding existing infrastructure and appliances as well as an attempt to create a robust and logically sound architecture.
While it was created with R77.30 in mind, it could be easily adapted for R80.10+.
There is an accompanying document labeled "Diagrams and Tables.pdf" that contains the full size drawings and tables shown here. It is posted separately, as I could not figure out the way to group both files under the same post.
Comments and suggestions on possible improvements are welcome.
Enjoy,
Vladimir