I am trying to install R80.10 on VMware for my learning. After I install GAIA and configure Security Management Server during the first login GAIA, I am unable to login through SmartConsole. I get “Unable to connect to server. Please make sure that all processes of the server are up and running.”. I checked cpconfig the certificate’s fingerprint is same as SmartConsole prompts, run cpm_status.sh showing CheckPoint Security Management Server is running state. And I have also tried to re-install GAIA with Jumbo Hotfix installed, but I get the same problem.
Do anyone instruct me how I can setup the environment? Is there any log file I can check for problem determination?
Thanks
It can take several minutes before you're able to connect with SmartConsole on the first startup.
What hardware (RAM/disk) did you configure the virtual machine with?
I wait for the system startup and load a while, and I checked the CPU utilization with "top" command. I assigned 6G RAM and 4 virtual core. When I login SmartConsole, it can prompt the server's fingerprint and I see there are few more java processes run. But after click to continue login, it returns "Unable to connect to server".
6gb of RAM is bare minimum and will not provide an optimal experience, especially on VM.
I would allocate at least 8gb of RAM to the VM, more if you intend to use SmartEvent as well.
In my LAB it takes around 10 minutes (2 GB RAM, 2 cores).
I am checking "api status" command to see if all proccesses were started (and if API is listening).
Just turn on VM and go for coffee
I wait for an hour and I checked "api status" that CPM and FWM are "Started" state but API is "Stopped".
What can I do next to fix it?
Thanks for your support.
try "api start" to manually start API.
Do you have valid license ? What is the output of "cplic print" command?
No license list out. I just downloaded the trial software and install on VMware for testing purpose.
You have trial license for 15 days only. As you dont have any listed there, the trial license already expired.
You need to generate 30 days evaluation all-in-one license from your UserCenter.
I just new created VM and installed the GAIA & Management Server. The trial license has not expired.
So from now on you have 15 days to do whatever you want. Are you able to connect via SmartConsole now?
Yes, after run "api start" and wait for the process started, I can login the SmartConsole. But, when I restart the firewall, the API does not start automatically. Is there any configuration I can let it start when the server start/restart?
Thank you for your support.
It is somewhere in SmartConsole Settings.
I enable the Automatic start option in Management API - Advanced Settings. Then publish, and run "api restart". After API restarted, I checked all processes (API, CPM, FWM) are Started. However, after "shutdown -r now" to reboot the CPM, the API process still not auto starts. I need to run "api start" manually. Is there any task I missed?
What does the output of $CPMDIR/scripts/check_cpm_status.sh show after restart?
/etc/fw/scripts/check_cpm_status.sh shows
CPM server started
Please check if this is applicable:
You can also try to install the latest jumbo hotfix for R80.10.
Just tried again today, the API processes can start automatically.
Thanks.
Can you tell us what did the trick to make it start automatically?
As I remembered that I didn't make any change. I just powered on the VM for testing again on some days after. I keep the memory at 2GB only. I didn't wait too while for the process to start.
Use this command to determine status of the management server: $CPMDIR/scripts/check_cpm_status.sh
[Expert@gw-83a11b:0]# $CPMDIR/scripts/check_cpm_status.sh
CPM server started
[Expert@gw-83a11b:0]#
I checked the status with this script. The Management Server is running.
i have a similar issue. but my problem was on R80.20 M2 newly installed server. running command show my CPM was started. but running cpwd_admin list show my FWM status was terminated. after a few check it was the hostname. My hostname was cp_mgmt, after changing it to cp-mgmt. i was able to access to the management thru smartconsole.
regards
Anthony
Leaderboard
Epsum factorial non deposit quid pro quo hic escorol.
User | Count |
---|---|
22 | |
14 | |
4 | |
3 | |
3 | |
3 | |
3 | |
2 | |
2 | |
2 |
Tue 07 Oct 2025 @ 10:00 AM (CEST)
Cloud Architect Series: AI-Powered API Security with CloudGuard WAFThu 09 Oct 2025 @ 10:00 AM (CEST)
CheckMates Live BeLux: Discover How to Stop Data Leaks in GenAI Tools: Live Demo You Can’t Miss!Thu 09 Oct 2025 @ 10:00 AM (CEST)
CheckMates Live BeLux: Discover How to Stop Data Leaks in GenAI Tools: Live Demo You Can’t Miss!Wed 22 Oct 2025 @ 11:00 AM (EDT)
Firewall Uptime, Reimagined: How AIOps Simplifies Operations and Prevents OutagesAbout CheckMates
Learn Check Point
Advanced Learning
YOU DESERVE THE BEST SECURITY